Nedraby vattenverk | Ystad

Specialwell- WaGate SPS-TG

Regulation of wastewater during maintenance. The waterworks has a building with large sand filters. When flushing these, the wastewater is released into 10 PE pipes DN315 which merge into one PE pipe DN450.

WaGate SPS-TG gate valves installed at Nedraby waterworks to regulate effluent discharge

The solution

Special well is connected to the PE pipe DN450: Inlet at 12 o'clock PE DN450, on the outlet at 16 and 18 o'clock there are 2 sluice gates WaGate SPS-TG DN450. From the well with the sluice gates the water should go on to 2 ponds. When the ponds are being drained, you want to be able to regulate the discharges using the gates.